AK.
HOMEABOUTWORKPROJECTSCREDENTIALSEDUCATIONCONTACT
← Projects & Case Studies
PORTFOLIO PROJECT·LIBRARY SYSTEMS

Library Management Portal

BACentric Capstone Project · Independent

An independent BA capstone project for BACentric certification — full requirements-to-wireframe delivery for an Online Library Management System, covering member management, catalogue search, book issuance and returns, and fine tracking.

My Role

Sole Business Analyst for this independent capstone project — owned requirements gathering, process mapping, and solution design end-to-end, from initial project brief through to wireframes and validation criteria.

Approach
  • Authored a Project Brief defining the problem statement, objectives, and scope for an Online Library Management System
  • Mapped As-Is and To-Be business processes to identify manual bottlenecks in book issuance, returns, and member management
  • Produced a combined As-Is & To-Be process flow document to visualise the transition from manual to system-based operations
  • Authored a Business Requirements Document (BRD) covering functional and non-functional requirements
  • Broke down requirements into Epics and User Stories for a phased delivery approach
  • Designed wireframes covering core library workflows — member registration, catalogue search, book issue/return, and fine management
  • Built a Validation Sheet defining test scenarios and acceptance criteria against the documented requirements
Component Library
Deliverables & Outcomes
  • Project Brief — problem statement, objectives, and scope definition
  • As-Is & To-Be Process Flow documentation
  • Business Requirements Document (BRD)
  • Epics & User Stories backlog
  • UI Wireframes covering core library management workflows
  • Validation Sheet — test scenarios and acceptance criteria
Key Takeaways
  • Mapping As-Is process pain points before defining To-Be workflows kept requirements grounded in real operational friction rather than assumed functionality
  • Breaking the BRD into Epics and User Stories made scope easier to sequence and validate incrementally
  • Building the validation sheet alongside the requirements — not after — surfaced ambiguous acceptance criteria early
Artifacts
← Projects & Case Studies